,

SIBA Safety Award

,

Project Safety Recognition

We recently recognized the outstanding work of our New Poag Richland Residential Project team for their recent Safety award.

Superintendent from Contegra Construction was honored with an award for the following:

NO safety violations, NO incidents, NO accidents, 100% PPE maintained and 100% Documentation

 

Congrats Contegra Team!  Left to Right:  Jim Mundy (Member/Project Executive), Dylan Bentley (Project Engineer), Kyle Kupinski (Superintendent), Josh Wilson (Assistant Superintendent), Rick Rebecca (Safety Director)

 

New Poag Richland Residential Project

486 Bed Housing Complex

9 Buildings with 2-bedroom, 3-bedroom, 4-bedroom units

Club house with work out room, study area, lounge/gaming room

Pool and bath house

15 Acre Site

 

 

,

Lot 9B Project Safety Recognition

We recently recognized the outstanding work of our Lot9B Project team for their recent Safety award.

Superintendent from Contegra Construction was honored with an award for the following:

NO safety violations, NO incidents, NO accidents, 100% PPE maintained and 100% Documentation

 

Congrats Contegra Team!  Left to Right:  Rick Rebecca (Safety Director), Jim Mundy (Member/Project Executive), Dennis Bentlage (Superintendent), Travis Cory (Project Manager)

 

Lot 9B Project:

594,000 SF Multi-Tenant Warehouse Distribution Center

32’ Minimum Clear Height

66 Dock Positions

Steel Frame, Metal Roof Deck, Tilt-Up Construction

,

Beardstown Project Safety Recognition

We recently recognized the outstanding work of our Beardstown Project team for their recent Safety honor.

Superintendent from Contegra Construction was honored with an award for the following:

NO safety violations, NO incidents, NO accidents, 100% PPE maintained and 100% Documentation

 

 

 

Beardstown Project:

3025 sf masonry bathhouse building with full amenities

8,000 sf pool with slide, diving board and miscellaneous water features

,

Project Safety Recognition

Superintendents from Contegra Construction were honored with an award for the following:

NO safety violations, NO incidents, NO accidents, 100% PPE maintained and 100% Documentation

True Manufacturing Project:

  • 200,000 SF Distribution Center for Adjacent True Manufacturing Facilities
  • Forty Dock Positions with one Drive-In Door
  • Building Clear Height of 36’0”
  • Steel Frame, Metal Roof Deck, Tilt-Up Construction
  • Glass Storefront with Composite Metal Panels at Main Entry

Congrats Contegra team for a job well done on the True Manufacturing Project!

Congrats Contegra team! Left to Right: Tony Uzzo (Project Manager), Darrell Marti (Superintendent),  Jim Mundy (Member), Rick Rebecca (Safety Director)