Wentzville Logistics Center
Wentzville, MO | Constructed as a General Motors critical parts supplier facility, sub-assembly operation, and processing facility, this 1.23M SF center utilizes conventional steel frame with metal roof deck and site-cast tilt-up panels. The warehouse boasts a total of 168 dock doors and six drive-in doors with heavy power distribution capabilities.
- Architect: Studio North Architecture
- Completion: January 2017
- Value: $37.5M